The foundations for the station (and concrete footings around the Splash Canyon layout for where Shockwave was going to be) were done in late 1992, but the actual full construction of the timber station was done just after the 93 season ended alongside the welding of track pieces.Biggest problem they got is when Splash Canyon was built for the 1993 season they also put the footings in and the station in for Shockwave.
The Splash Canyon buildings including the pumping station, Splash queue line buildings, fog tunnel and mining animatronics were all built for the grand opening ft Noel Edmonds.