Looking great I think I may come as a guest next Monday so can't waitI lot happened in 12 days. The queue line currently been installed with the queue entrance on the left side, also the ride exit path as the entrance the station platform on the right. The control panels look ready to be installed and loving the lights currently been installed which I think means it may be available for the Christmas ride line up.
View attachment 2959View attachment 2960View attachment 2961View attachment 2962View attachment 2963View attachment 2964View attachment 2965View attachment 2966View attachment 2967
Yep I'd say 4-5wks potentiallyUnless they have so many contractors on site for the next 10 days I can’t see it been all ready for the start of the summer holidays on the 22nd July.
But can see the rapids soft opened for staff training soon (loading and unloading training)
Think they do that cause it’s cheaper, Easy to clean and easy to replaceI love all the efforts and updates from the park and looping group. Some rides and areas look great of course! However am I the only person who thinks certain theming or aspects look a little dated or tacky. I.E the wave swinger theme looks “seaside” almost dated too me. As well as the chicken diner sign. I’m not a fan of flat signage either for theme parks. However I’m a huge fan of shockwaves and river rapids building refurbishments styles and efforts!