Gold Rush (New for 2024)

Well look at this. Wild West confirmed.
IMG_3696.jpeg
 
They still installing the footers but look how close this coaster will come to Jormungandr and they removed the metal fence to the right side of the park.
743BA601-4DC7-4537-A027-E7C9D439BAF3.jpeg
6BB4B3D9-29B8-4CDC-9133-BFEE669C7B47.jpeg
49017BBB-B047-45E5-8B33-0A817934BAAD.jpeg
5F76A627-1677-4D6D-B8FA-CC3B5B156D21.jpeg
F33A5A26-205F-477A-86F9-59D871C9F550.jpeg
BDE66335-8ACA-4B3E-97A4-6D80C1F9A1E5.jpeg

The toilet block been painted
F9FED3B2-6907-4C5F-9C26-EBDA428D7176.jpeg
6907FF08-FA95-4040-AC7F-4228F4321936.jpeg

The town area starting to look good
ECB48D50-93BC-418B-96F2-38A757B39245.jpeg
BE57D38E-9A6E-44E3-994C-B7895E7CFC19.jpeg
3D27C501-BE66-4918-B961-0C30C164E469.jpeg
7C493749-A1EA-40DE-8F4C-07D9CA9E446B.jpeg

They still using the former cafe to paint things
7A2683E8-6A81-47DB-A188-636B68B909AF.jpeg
 
They still installing the footers but look how close this coaster will come to Jormungandr and they removed the metal fence to the right side of the park.
View attachment 5189View attachment 5190View attachment 5191View attachment 5192View attachment 5193View attachment 5194
The toilet block been painted
View attachment 5195View attachment 5196
The town area starting to look good
View attachment 5197View attachment 5198View attachment 5199View attachment 5200
They still using the former cafe to paint things
View attachment 5201
I like the toilet as a barn house
 
More track has arrived
View attachment 5246
More footers been installed at the top end of the park. This coaster gonna be massive.
View attachment 5247View attachment 5248View attachment 5249View attachment 5250View attachment 5251
More theming added on the buildings
View attachment 5252View attachment 5253View attachment 5254View attachment 5255
Noticed the footers on Saturday from the top of Accelerator. I would've taken photos of the new track as well but I wasn't actually sure where it was. :ROFLMAO:
 
Considering LegoLand’s new coaster for 2024 has started to have track installed, I think it’s only a matter of time before Drayton start putting theirs up.
 
More track has arrived
View attachment 5246
More footers been installed at the top end of the park. This coaster gonna be massive.
View attachment 5247View attachment 5248View attachment 5249View attachment 5250View attachment 5251
More theming added on the buildings
View attachment 5252View attachment 5253View attachment 5254View attachment 5255
A few intersting spots there, FIrst the new track pieces appear to contain one for the drive tyre launch. Second the new footers are preceded by an S-bend, and this coupled with the location suggests it might be a maintenance area, what with the proximity to the road, and this would indicate 2 train operation :D
 
Considering LegoLand’s new coaster for 2024 has started to have track installed, I think it’s only a matter of time before Drayton start putting theirs up.
I think ground work will be all finished off by the end of next week and the coaster with start to go up in Jan and could be all finished for the start of the Feb half term. With testing. Like they already started re theming the other rides in the area.
 
Back
Top