Themeparksandy1981
Member
I think the ware house is the building that’s going up now for the station/queue line building
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature currently requires accessing the site using the built-in Safari browser.
Well, I'll be rolled in flour and baked as a strudel...never expected them to be testing so soon! Loving the look of the subs.Taken today from Blue Mountain's as walking off the ride. They have a boat in the trough & filled with water. Can only assume it's been testing hit didn't see this myself
The trough was definitely filled with water yesterday (at least where the boat was, which I assume means it was all filled). They're going to be pushing it for 3 weeks time but 2 weeks ago the trough wasn't even in so I guess it's doableThere’s no water in there yet but they could be just seeing for clearance as that bloke is measuring the channel.
I did hear they were aiming for the next bank holiday which is only 3 weeks ahead.
I wonder if ther going to replace James and put an aeg Thomas there with the submarine and put James back to Knatfords slidingTaken today from Blue Mountain's as walking off the ride. They have a boat in the trough & filled with water. Can only assume it's been testing hit didn't see this myself
James is still there! They’ve a just pushed him back into the tunnel a bit and took out the coach; he’s spottable in other construction pics.I wonder if ther going to replace James and put an aeg Thomas there with the submarine and put James back to Knatfords sliding
It would be better than just scrapping itJames is still there! They’ve a just pushed him back into the tunnel a bit and took out the coach; he’s spottable in other construction pics.
That coach could be nice on the siding though…
Taken today from Blue Mountain's as walking off the ride. They have a boat in the trough & filled with water. Can only assume it's been testing hit didn't see this myself
Probably to fit in with the rides colour scheme, do you have any photos of this? Just sounds rather odd it was painted blue. (not like i don't believe you, just curious)Does anyonr know why Mathwaite is now blue?
Its on the page by mpdarbyProbably to fit in with the rides colour scheme, do you have any photos of this? Just sounds rather odd it was painted blue. (not like i don't believe you, just curious)
I’d say to make it stand out a bit more plus fit in with the seaside/docklands theme of the ride area; that dull look it initially had wouldn’t be the most standout queuing/pre-show building.Does anyonr know why Mathwaite is now blue?
Probably to fit in with the rides colour scheme, do you have any photos of this? Just sounds rather odd it was painted blue. (not like i don't believe you, just curious)
With the new subs...will they be opening a themed baguette shop nearby?My little one questioned the fat controller asking him when the new ride will open. He said it should have been this week for the Thomas birthday but he has mentioned to keep an eye out for may half term week instead. There was construction going on for a show building by the look of it with people working on the roof all day. The trough was completely filled with water all day but no subs in the water. By the looks of it , it’s mainly the surrounding areas they are working on rather than the physical ride itself.