The Wave (formerly known as Shockwave)

Today’s operations were massively improved as the map bars could come down in one move rather than the usual half way first routine.

I wonder what’s changed!
This has been the case for a while, I believe Drayton had ART engineering back in to update the train to be capable of doing the necessary verification of the two restraint systems.
 
Anyone ever noticed this outside of the windiw in the queue line?
 

Attachments

  • Screenshot_20241103_222548_TikTok.jpg
    Screenshot_20241103_222548_TikTok.jpg
    92.7 KB · Views: 27
Back
Top